
August 31, 2011
Monday, Aug. 29, about 24 hours after the storm subsided, a contractor moves boulders in place next to English Brook to provide some protection for English Brook Cottages & Storage units (background) if the stream is again inundated with floodwaters. The prior day, English Brook jumped its banks and ripped through the property along Rte. 9. At one point in its course, the brook was 15 feet above normal level.
Stories this photo appears in:
Lake George starts cleaning up tropical storm damage
While utility workers toiled feverishly Monday, Aug. 29 to repair dozens of downed power lines and burned-out transformers
Comments
Use the comment form below to begin a discussion about this content.
Sign in to comment
Or login with:
OpenID